结构施工图校审细则精简版
结构施工图校审细则结构施工图校审细则 目录 1 编制说明····················································· 4 2 审校原则····················································· 4 3 常用结构计算分析软件········································· 5 4 设计参数(以 PMCAD 为例)····································· 5 5 设计参数(以 SATWE 为例)······································ 8 6 地基基础设计(以 JCCAD 为例)·································· 13 7 板平法施工图··················································14 8 梁平法施工图··················································16 9 墙、柱平法施工图··············································17 10 楼梯平法施工图···············································18 11 基础平面布置图···············································19 12 地下室结构大样···············································20 13 结构设计说明·················································20 14 目录及图签···················································20 15 计算书·······················································20 16 归档交验内容·················································21 1.编制说明: 略 2.审校原则: 略 3. 常用结构计算分析软件 略 4.4. 设计参数(以设计参数(以 PMCADPMCAD 为例)为例) 4.1 ▲★设计参数各项正确,与建筑物设计条件相符。 4.2 ▲★楼层组装,总层数和各层层高与建筑核对,特别注意首层层高应算至基础顶(首层 地坪有基础拉梁时宜按一标准层计算,拉梁层设为地下室,且拉梁按框架梁设计)。“与基 础相连构件最大底标高”数值应正确。 4.3 ▲★计算模型与实际情况相符,模型简化应合理。 4.4 各标准层梁、柱、墙、洞口等构件布置及截面是否合理;各层混凝土强度是否合理;竖 向构件应上下连续、合理分段减小截面(注意建筑立面要求) ;梁高要考虑建筑外墙窗顶标 高和室内净空要求。 1) 柱布置:柱网布置应力求做到简单、规则、整齐,柱网尺寸应符合经济原则并尽量符合 模数。现浇钢筋混凝土民用建筑结构常用柱网6~12 米,超过 9 米不经济。 2) 梁布置: a、 主要承重框架横向布置, 可以有效地提高房屋横向的抗侧强度和刚度。 这种布置不仅结 构上合理,而且建筑上有利于立面处理和室内采光。 b、 主梁纵横向梁高应区别,截面高度可取跨度的1/10~1/15,且应及时与各专业配合。 c、 次梁布置尽量将荷载传给主受力框架方向,截面不宜过宽,正常宽度250 即可。 3) 剪力墙布置: a、 剪力墙上相关专业预留的较大洞口应按实际计算 b、 剪力墙的截面厚度应符合墙体稳定验算 4) 柱、墙、梁的偏心应按实际输入 4.5 楼板布置,板厚、错层、悬挑板(空调板、雨篷等)、楼板开洞。 4.6▲荷载: 1) 输入荷载是否选取“自动计算板自重”; 2) 若“考虑活荷载折减”,将与后续 SATWE 等三维计算、基础导荷所用的活荷载折减同时 考虑,因此建议仅在 SATWE 前处理模块中设置活荷载折减系数; 3) 楼板恒、活荷载及梁、墙荷载取值正确,人防顶板、非人防顶板荷载区分; 4) 特殊荷载输入,如吊车、二次装修幕墙、设备安装吊挂、雨棚、网架等。 5) 楼板上均布的消防车荷载取值见《建筑结构荷载规范》表5.1.1,当楼盖上有覆土时, 可对楼面消防车活荷载标准值进行折减, 见荷载规范附录 B;设计楼面梁时消防车活荷载折 减系数见荷载规范 5.1.2 条;设计基础时可不考虑消防车荷载。 6) 易遗漏处: a、 剪力墙上砌隔墙和门窗洞口隔墙荷载。 b、 翻边(雨篷、挑檐、下挂板)荷载。 c、 楼梯多于两跑时应增加恒活荷载、楼梯间按楼板导荷与梯梁梯柱布置是否相符。 d、 电梯机房层钢梁集中力、电梯机房顶吊钩集中力、多层地下室电梯基坑不落至基础时 底坑荷载。 e、 特殊用途及有重型设备房间荷载(如水箱间、配电间、消防控制室等)。 f、 板上有集中力(如隔墙、设备基础、屋面台阶、钢梯)时应考虑等效荷载。注意走廊、 挑阳台、卫生间、大教室、太阳能屋面等部位的恒、活荷载。如楼板为预制板注意荷载的传 导方向。 g、 地下室顶板覆土荷载,是否应考虑室外景观小品荷载。屋顶花园荷载。 h、 应考虑屋面、雨篷上积水积雪荷载,对风、雪荷载敏感的结构形式尚应考虑荷载取值 的不同及相关参数的放大。 i、 是否有吊挂荷载。 j、 屋面为空间网格结构时,不能简单把空间网格结构的支座反力加到主体结构上,应选取 合适软件进行组合模型整体计算,判断阵型、位移、扭转、刚度、内力、配筋等参数的合理 性并分析采用。 5 5.设计参数(以.设计参数(以 SATWESATWE 为例)为例) 5.1▲★设计参数各项取值合理,与统一技术措施相符。 1) 提前确认建设当地地震局对地震作用计算参数是否有相关要求, 如果建设场地有 《地震 安全性评价报告》,抗震设计时,在小震作用下,分别取规范和“安评”的地震动参数计算, 取二者计算所得到的结构底部剪力较大者的楼层水平地震力进行结构抗震验算, 中震、 大震 作用下的结构验算,按规范提供的地震动参数进行。 2) 建筑物抗震设防及设计要求是否符合特殊行业标准,如中小学校、幼儿园、医院、监狱 等。 3) 注意建筑场地为Ⅲ、Ⅳ类时,对设计基本地震加速度为0.15g 和 0.30g 的地区,宜分别 按抗震设防烈度 8 度和 9 度时的要求采取抗震构造措施。 4) 以下情况应考虑竖向地震作用:7.5 度(仅高层)、8 度、9 度时的大跨度和长悬臂结 构及 9 度时的高层建筑。(见高规4.3.2 及条文说明、抗规 5.1.1 及条文说明)。 以下情况应考虑以竖向地震为主的荷载组合:7.5 度(仅高层)、8 度、9 度时的大跨度和 长悬臂结构。 5) 建筑物抗震设防类别、设防烈度、设计地震分组、抗震等级; 6) 校核场地类别、场地土类型; 7) 是否应考虑重力二阶效应及整体稳定性是否满足要求(见高规5.4 节); 8) “嵌固端所在层号”,SATW