蚂蚁文库
换一换
首页 蚂蚁文库 > 资源分类 > DOC文档下载
 

工程管理专业外文文献及翻译

  • 资源ID:56077994       资源大小:113.50KB        全文页数:25页
  • 资源格式: DOC        下载权限:游客/注册会员    下载费用:15积分 【人民币15元】
快捷注册下载 游客一键下载
会员登录下载
三方登录下载: 微信快捷登录 QQ登录  
下载资源需要15积分 【人民币15元】
邮箱/手机:
温馨提示:
支付成功后,系统会自动生成账号(用户名和密码都是您填写的邮箱或者手机号),方便下次登录下载和查询订单;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,既可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   

工程管理专业外文文献及翻译

精品文档---下载后可任意编辑 本科毕业设计 外文文献及译文 文献、资料题目Changing roles of the clients Architects and contractors Through BIM 文献、资料来源Engineering, Construction, Archi tectual Management 文献、资料发表出版)日期2024。2 院 (部 专 业 班 级 姓 名 学 号 指导老师 翻译日期 精品文档---下载后可任意编辑 外文文献 Changing roles of the clients,architects and contractorsthrough BIM Rizal Sebastian TNO Built Environment and Geosciences, Delft, The Netherlands Abstract Purpose – This paper aims to present a general review of the practical implications of building ination modelling (BIM based on literature and case studies. It seeks to address the necessity for applying BIM and re-organising the processes and roles in hospital building projects。 This type of project is complex due to complicated functional and technical requirements, decision making involving a large number of stakeholders, and longterm development processes. Design/ology/approach – Through desk research and referring to the ongoing European research project InPro, the framework for integrated collaboration and the use of BIM are analysed. Through several real cases, the changing roles of clients, architects, and contractors through BIM application are investigated。 Findings – One of the main findings is the identification of the main factors for a successful collaboration using BIM, which can be recognised as “POWER product ination sharing (P),organisational roles synergy (O), work processes coordination W, environment for teamwork E), andreference data consolidation (R. Furthermore, it is also found that the implementation of BIM in hospital building projects is still limited due to certain commercial and legal barriers, as well as the fact that integrated collaboration has not yet been embedded in the real estate strategies of healthcare institutions。 Originality/value – This paper contributes to the actual discussion in science and practice on the changing roles and processes that are required to develop and operate sustainable buildings with the support of integrated ICT frameworks and tools. It presents the stateof-theart of European research projects and some of the first real cases of BIM application in hospital building projects。 Keywords Europe, Hospitals, The Netherlands, Construction works, Response flexibility, Project planning Paper type General review 1. Introduction Hospital building projects, are of key importance, and involve significant investment,and usually take a longterm development period. Hospital building projects are also very complex due to the complicated requirements regarding hygiene, safety, special equipments, and handling of a large amount of data。 The building process is very dynamic and comprises iterative phases and intermediate changes。 Many actors with shifting agendas, roles and responsibilities are actively involved, such as the healthcare institutions, national and local governments, project developers, f

注意事项

本文(工程管理专业外文文献及翻译)为本站会员(zhuwo)主动上传,蚂蚁文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知蚂蚁文库(发送邮件至2303240369@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们


网站客服QQ:2303240369

copyright@ 2017-2027 mayiwenku.com 

网站版权所有  智慧蚂蚁网络

经营许可证号:ICP备2024020385号



收起
展开