建筑工程管理的英文句子
135 A project cution is usually divided into some elementary phases, such as engineering, procurement and transportation, and field construction.一个工程项目的实施 通常可分为几个基本阶段工程设计、采购和运输、以及现场施工。 136 We are building an ethylene plant with an annual capacity of 300,000 metric tons. 我们正在建设一座年产三十万吨的乙烯工厂。 137 The contract number of this project is CJC78-8. 这个项目的合同号是 CJC78-8。 138 The Sellervendor is Toyo Engineering CorporationTECof Japan.卖方(卖主)是日本的 东洋工程公司。(简称 TEC) 139 The Buyer customer, client is China National Technical Import Corporation.CNTIC 买方(主顾、顾客)是中国技术进口总公司。(简称CNTIC) 140 China National Chemical Construction Corporation CNCCC contracts for domestic and overseas chemical projects.中国化工建设总公司(简称CNCCC)承包国内和海外的化工工程。 141 We can contract to build turn-key plant, undertake single items of projects as a subcontractor or provide labor services. 我们可以承建成套工厂或分包单项工程或提供劳务。 142 The “UHDE” Corporation of Federal Germany takes part in this project as a patent licenser.owner of the know-how 联邦德国的“伍德”公司作为一个技术专利执证者(专门技术所有者)参加此项工程。 143 Are you the Seller’s Representative on the job site 你是卖方的现场代表吗 144 I am the Buyer’s General Representative.GR 我是买方的总代表。(简称GR) 145 It is an inquiry commercial and technical proposal, approval, agreement, protocol, annex, technical appendix about this project. 这是这个项目的询价书。(商务和技术报价书、批准书、协议、会议记录、附加条件、技术附件) 146 There are many ination in the technical proposal, which including process flow, process description, capacity of the plant, perance of the product.技术报价书中有很多资 料,包括工艺流程、工艺说明、生产能力、产品特性等。 147 There are two units installations in the contract plant. within the battery limits在合同 工厂内(界区范围内)有两个车间。(装置) 148 The project team normally consists of project engineer, design engineer, schedule engineer, and various specialists. 项目工作组通常包括有项目工程师、设计工程师、计划工程师、以及各类专家。 149 We can uate the results of field construction by four criteria , which are quality, time, cost and safety. 我们可以通过四个指标来评价现场施工的成绩,即质 量、时间进度、费用和安全。 150 I am responsible for the technical scheduling, inspection, quality control work of this project. area 我负责这个项目(区域)的技术(技术、检查、质量控制)工作。 151 Would you tell us the technical characteristic about this project 你能告诉我们有关这个工程项目的技术特性吗 152 Please give a description about this project. 请对这个工程项目作一个叙述说明。 153 The project is certain to be a success.这个项目一定会得到成功。 154 Do you have any reference materials about this project 你有关于这个工程项目有参考资料吗 七、计划与进度(20 句) PLANNING AND SCHEDULING 155 We should work according to the overall schedule chartthe construction time schedule of the project. 我们应该按照工程项目的总进度表(建设进度表)工作。 156 The effective date of this contract will begin from July sixth , nineteen eight-three. 这个合同的有效期将从一九八三年七月六日开始。 157 The Seller will provide preliminary finaltechnical documents for Buyer in May. 卖方将于五月份向买方提供初步(最终)技术文件。 158 The basic detailed process design will be issued before August. 基本的(详细的)工艺设计资料将于八月前发出。 159 Our major planning items contain estimating of cost and construction schedule. 我们主要的计划工作项目包括费用预算和施工进度。 1