蚂蚁文库
换一换
首页 蚂蚁文库 > 资源分类 > DOC文档下载
 

3ManagementProcedure

  • 资源ID:50599576       资源大小:2.38MB        全文页数:112页
  • 资源格式: DOC        下载权限:游客/注册会员    下载费用:30积分 【人民币30元】
快捷注册下载 游客一键下载
会员登录下载
三方登录下载: 微信快捷登录 QQ登录  
下载资源需要30积分 【人民币30元】
邮箱/手机:
温馨提示:
支付成功后,系统会自动生成账号(用户名和密码都是您填写的邮箱或者手机号),方便下次登录下载和查询订单;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,既可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   

3ManagementProcedure

3.1 Organization, Resources and Documents To achieve the HSE objectives and be in line with HSE policies, all levels of drilling project management should participate actively in the HSE management. HSE function should be established or dedicated persons designated. The management should allocate necessary human resources, financial and documentation resources for the project HSE management. 3.1组织机构、资源和文件 为实现HSE方针和目标,钻井项目各级管理人员都应主动参与HSE管理工作,应建立HSE职能部门或确定特地的人员并从人力、财力和文件等方面配备必需的资源。 Subsidiaries/Projects Manager 分(子)公司/项目经理 Deputy subsidiaries /Projects Manager 分(子)公司/项目副经理 Purchasing Manager/superintendent 采办经理/主管 Engineering Manager/superintendent 工程经理/主管 HSE Manager/superintendent HSE经理/主管 Finance Manager/superintendent 财务经理/主管 Administration Manager/superintendent 行政经理/主管 Rig Site钻井现场 Rig Manager 钻井平台经理 Client site representative 甲方现场代表 HSE Officer 平安官 Toolpusher 带班队长 Mechanic 机械工程师 Electrical Engineer 电气工程师 Material Man 材料员 Subcontractor 分包商 Camp Manager 营地经理 Driller 司钻 Doctor 现场医生 Drill Shift 钻井班组 3.1.1 Organizational Structure and Responsibilities 3.1.1.1 Organizational Structure HSE administrative framework of SINOPEC SERVICE land drilling project including rig crew is shown as above. The project HSE administrative organization includes two levels project HSE committee and rig HSE team, the rig HSE team reports to the project HSE committee. Project HSE Committee Leader Subsidiary/ Project manager i.e. project manager Vice leader Deputy subsidiary / project manager i.e. deputy project manager Members HSE manager/superintendent , Engineering manager/superintendent, Purchasing manager/superintendent, Finance manager/superintendent, Administration manager/superintendent, etc . The project HSE committee shall - Implement SINOPEC SERVICE HSE MS and satisfy requirements from client. - Draft project HSE program, and monitor the implementation of the program. - Per HSE inspection and hazard identification; follow the rig site on taking risk reduction measures. - Organize HSE training to personnel and allocate necessary resources for implementation of the HSE MS. - Establish emergency response plan, per necessary emergency drills, and improve personnel’s emergency response capability. - Communicate internally and externally, report to upper level of organization as required. The rig HSE Team Leader Rig manager Members Toolpusher, HSE officer, Electrical engineer, Mechanic, Driller, Camp manager, Doctor, etc. The rig HSE Team shall - Implement SINOPEC SERVICE HSE MS requirements and HSE requirements from the client. - Per hazard identification and implement the project HSE program. - Per HSE inspection regularly, hold HSE meeting and report HSE issues as scheduled. - Organize all kinds of HSE training to improve personnel HSE aw

注意事项

本文(3ManagementProcedure)为本站会员(BR2h)主动上传,蚂蚁文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知蚂蚁文库(发送邮件至2303240369@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们


网站客服QQ:2303240369

copyright@ 2017-2027 mayiwenku.com 

网站版权所有  智慧蚂蚁网络

经营许可证号:ICP备2024020385号



收起
展开